PROGRESS OF WORKS

October 2016

  • At Ethnarhou Makariou street, the relocation of the storm water pipe in the section from Karaoli & Dimitriou street to Myrtidiotissis street has been completed, while in progress are the Tramway earthworks in the same area.
  • At Mikras Asias street, the works for the construction of the Tramway from Papandreou Bridge to the beginning of Gr. Lambraki street (after the U-turn), outside the pocket area, have been completed. In progress are works for the construction of the Tramway at Papandreou bridge, where trackworks have already been completed.
  • At Grigoriou Lambraki street, the works have been completed concerning the relocation of PUO networks, the urban planning works at the sidewalk across the street, as well as the works related to the Tramway and the urban planning at the adjacent sidewalk (including Lambraki and Evaggelistrias stops), at the section extending between the U-turn of Lambraki street and Venizelou street. In progress are the works for the construction of Deligianni stop.
  • At Vas. Georgiou street, temporary traffic arrangements have been implemented on the part of the street from Iroon Polytechniou to Ethnikis Antistaseos streets. In progress is the archaeological excavation at the Substation construction location.
  • At Ethnikis Antistaseos street, the PUO relocation works, as well as the works for the construction of the Tramway in the section from Ippodamias to Tsamadou streets, have been completed. In progress is the construction of the Tramway in that area.

(The location of the tramway corridor is the point of reference for the terms sidewalks “across the street” and “adjacent”).

Print Friendly, PDF & Email

September 2016

  • At Ethnarchou Makariou Street, in progress are works for the relocation of the rainwater drainage pipe.
  • At Mikras Asias street, completed are the works for the construction of the tramway corridor from Papandreou Bridge past Sarantaporou Street. The urban planning of the area and Mikras Asias stop is completed.
  • At Grigoriou Lambraki street, the urban planning of the opposite sidewalk has been completed. Moreover, the construction of the tramway corridor and the urban planning works of the adjacent sidewalk (including Lambraki and Evangelistrias stops) from the U-turn in Lambraki Street up to Venizelou Street are in progress. In progress are also works for the construction of a tramway corridor from Venizelou Street up to Vas. Georgiou Street, as well as the urban planning of the adjacent sidewalk in this area.
  • At Vas. Georgiou street, the urban planning works at the opposite sidewalk and the works for the relocation of the rainwater drainage pipe at V. Georgiou and Ethn. Antistasseos junction have been completed, and in progress are the remaining works for PUO networks. In progress are the works for the construction of a tramway corridor and urban planning works from Lambraki up to Praxitelous Street. The archaeological excavations from Praxitelous to Iroon Polytechniou Street are in progress.
  • At Ethnikis Antistaseos street, completed are the urban planning works at the opposite sidewalk.
    In progress are works for the construction of the tramway corridor from Ippodameias street up to Tsamadou street, as well as the urban planning works at the adjacent sidewalk.
  • At Omiridou Skylitsi street, in progress are the works for the relocation of the PUO networks (from Lambraki Bridge to Tzavellas Street).
  • At Piece and Friendship Stadium (SEF) stop, works for the construction of the tramway corridor and reconfiguration of the stop are in progress.

(The reference “opposite” and “adjacent sidewalks” is related to the Tramway traffic).