AGHIA VARVARA Station: The works for the construction of columns down to the concourse level have been completed, while the works for the construction of access 3 are in progress; KORYDALLOS Station: The removal of the launch cradle and the TBM false tunnel precast segments has been completed. The undisturbed…
Μάθε Περισσότερα

June 2015

The works for the relocation of the sewage network located at the adjacent sidewalk of Omiridou Skylitsi street (from Ippodamias square – 34th Syntagmatos street), of the two sewage pressure pipes at Vas. Georgiou street and of the stormwater network in Mikras Asias street have been completed. The works for…
Μάθε Περισσότερα

June 2015

NOMARCHIA Station and Crossover: The works for the construction of temporary retaining piles are at an advanced stage; KALAMARIA Station: Works for the construction of temporary retaining piles are in progress; NEA KRINI Station: Works for the retaining of the station are in progress (installation of struts at the 2nd…
Μάθε Περισσότερα