Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

January 2017

• At Ethnarhou Makariou street, in progress is the construction of Karaiskaki stop and the staircase connecting this stop with the underground pedestrian walkway.

• At Papandreou bridge and at Micras Asias Street, at the completion stage are the works for the construction of the tramway corridor (fitting of rails), as well as pending works in the pocket area and the transition area from Papandreou bridge to Micras Asias street.

• At Grigoriou Lambraki street, street lighting works have commenced and are soon to be completed. Tramway corridor construction works from the U-turn of Lambraki street to Venizelou street have been completed, while in progress is the construction of the tramway corridor from Venizelou street to Vas. Georgiou Street (trackwork of the main line has been completed, while at a completion stage are the works in the pocket area and the rail installation works on the main line and the pocket).

• At Vas. Georgiou street, in progress is the construction of the Tramway corridor from Alkiviadou street to the crossing on Iroon Polytechniou street.

• At Ethnikis Antistaseos street, the urban planning works at Aghia Triada stop have been completed and in progress are the works for the construction of Ippodamias stop. The construction of the tramway corridor trackwork from Georgiou street to Ippodamias street have been completed.

• On Omiridou Skylitsi street, in progress are the works for the construction of Androutsou and Omiridou Skylitsi stops.

(the reference to the “adjacent” or “facing” sidewalk relates to the actual location of the tramway corridor).

Print Friendly, PDF & Email
WCAG