Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

The main tunnel of the entire Project shall be a double track tunnel (approximate inner diameter 8.5m, outer diameter of 9.5m). It shall be constructed using TBMs, which will be designed and equipped with state of the art technology and taking into account the anticipated ground conditions, the hydrogeological and geotechnical conditions in the Project area, with the exception of the tunnel sections and underground stations, which shall be constructed using NATM method.

Double and Triple Track Typical Sections Permanent Structures

Proposed Construction Method

Print Friendly, PDF & Email
WCAG