Program for the development of Parking facilities for Private Vehicles

Apart from the Transfer Stations – Parking Facilities presented in our website, ATTIKO METRO S.A. (AM) has already promoted the construction of the following new parking facilities, namely:

AGHIA MARINA Station - Parking Facility 

This Project is being constructed concurrently with the relevant Metro Station on Iera Odos, between Krinis and Ag. Marinas streets. The Facility in question shall have a total capacity of 383 parking spaces including a ground floor, a basement and 3 levels.



Keramikos Area – Parking Facility

This area is located at a distance of approximately 300m. from KERAMIKOS Metro Station, in a land plot owned by the Municipality of Athens, at the intersection of Pireos and Iera Odos Streets. In the past, KERAMIKOS Metro Station was planned to be constructed in the above land plot; however, due to problems related to the alignment of the Line underneath the archaeological area of Keramikos, the Project for the construction of the said Metro Station has been abandoned, although the area in question had already been excavated. The Ministry of Development, Competitiveness, Infrastructures, Transport and Networks made the decision to utilize the existing excavation creating, thus, an underground 5-level car park area with a total capacity of 270 spaces. Within the framework of this Project, provision is made for the re-configuration of the area, covering approximately 9,000m2, while the park to be created shall be rendered to the Municipality of Athens, which participated actively in the preparation of the surface landscaping drawings.

PARKING FACILITIES TO BE CONSTRUCTED

Concurrently, ATTIKO METRO S.A. prepares designs related to the construction of new parking facilities for private vehicles as follows:

STATION

CAPACITY

LEVELS

AGHIA MARINA (extension)

+150

2 basement areas

HALANDRI Parking No2

450

3 basement areas

Doukissis Plakentias*

1.000 

4 basement areas

Eleonas Parking No 1

400

3 basement areas

Eleonas Parking No 2

800 

open-air

Egaleo

     450 

3 basement areas

Anthoupoli

450

4 basement areas

Ethniki Amyna (extension)

+270 

open-air

Ághia Paraskevi

500

3 basement areas

Ilioupoli

650 

2 basement areas

Álimos

 450 

3basement areas

Elliniko

700

3 basement areas

Árgyroupoli

1.000 

4 basement areas

Ághia Varvara

160 

basement area























* With the construction of the new underground parking facility at DOUKISSIS PLAKENTIAS station, the existing parking spaces are being abolished.

   
 
Print this page E-mail this page
    Last Updated: 13/3/2013
 
     
       Messogeion Aven. 191-193, 115 25
  Athens Tel. 210 6792399,
  Fax. 210 6726126
Co - Funded By Greece and E.U.
ATTIKO METRO S.A. 2007 All rights reserved
Powered by Osmium™ | Creative Marketing S.A.