LINE 2 (AGHIOS ANTONIOS – AGHIOS DIMITRIOS)
The construction of Line 2, being part of the Base Project, commenced in November 1992. The 7 first stations of Line 2 in SEPOLIA – SYNTAGMA Section were handed over to the public in January 2000, while 5 additional kilometers with 5 stations in SYNTAGMA – DAFNI Section were commissioned in November 2000.
SEPOLIA – AGHIOS ANTONIOS EXTENSION
In early August 2004, AGHIOS ANTONIOS Station was handed over to the public within the framework of Line 2 extension towards the western suburbs of Attica Basin. This extension is 1,4 km long and serves 50, 000 passengers on a daily basis.
SEPOLIA – AGHIOS ANTONIOS Extension is of major importance, since, in this way, the Metro passed beyond Kifissos river boundaries and reduced dramatically the traveling time of the residents of the western suburbs. Today, it takes just seven minutes from AGHIOS ANTONIOS Station to reach the city center (Omonia Square) and 45 minutes to reach ELEFTHERIOS VENIZELOS International Airport (with one transfer at SYNTAGMA Station) traveling safely, rapidly and comfortably.
AGHIOS ANTONIOS is the first Station of the ATHENS METRO System new generation, while the basic axes for its final configuration were the following:
 |
Integration and display of the underground project to the urban web |
|
 |
 |
Comfort and functionality, both inside and outside the station |
|
 |
 |
Utilization of positive natural parameters to save energy and protect the environment |
AGHIOS ANTONIOS Station is harmonically integrated into the surrounding area and enhances to a great extent the quality of daily life of the residents and the Metro users.
DAFNI – AGHIOS DIMITRIOS EXTENSION
The new section of Line 2 from Dafni up to Aghios Dimitros is an extension 1.2 km long with one station (AGHIOS DIMITRIOS/ALEXANDROS PANAGOULIS); 350m out of the 1.2 km consist in a triple track tunnel and 860m in a double track tunnel. This extension was constructed using the NATM and the Cut and Cover (C/C) methods.
The whole project was constructed based on high standards set by ATTIKO METRO and includes power supply and distribution E/M systems, ventilation systems, pumping stations, lighting and fire protection systems, lifts and escalators. Moreover, up-to-date systems were installed for the operational needs of the Line, such as weak current systems, signaling, telecommunication and remote control systems, CCTV, public address, clock system and passengers’ information.
The construction works for DAFNI Station – AGHIOS DIMITRIOS/ALEXANDROS PANAGOULIS Station extension were completed within 2004 and the station was commissioned on 05.06.04, following the reinstatement of the surrounding area.
Nowadays, this Extension serves 45,000 passengers on a daily basis.