Day: July 25, 2016

June 2016

NOMARCHIA Crossover: The works for the installation of metal struts at the 3rd level have been completed. In progress are the excavation and temporary retaining works up to the invert. KALAMARIA Station: The installation of metal struts at the 2nd level have been completed. In progress are the excavation works…
Μάθε Περισσότερα

June 2016

Dimokratias Crossover: Works for the excavation of the final level are in progress. DIMOKRATIAS Station: Completion of the construction of slab -2. Moreover, in progress is the archaeological excavation of the final level. SINTRIVANI Station – REPORT: In progress is the temporary retaining of the northern access. PAPAFI Station: In…
Μάθε Περισσότερα

June 2016

At Mikras Asias street, in progress are the works for the construction of the tramway corridor from Papandreou Bridge up to Sarantaporou street. In progress are the works for the construction of the tramway corridor from Sarantaporou street up to Lambraki Bridge with the U-turn as well as the urban…
Μάθε Περισσότερα

June 2016

AGHIA VARVARA Station: The works for the removal of the precast segments of the false tunnel and the last ring have been completed. Works for the industrial floors and fillings are in progress. At M. Alexandrou Shaft, in progress are the excavation and temporary retaining works. NIKEA Station: The works…
Μάθε Περισσότερα