Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

Day: January 20, 2017

December 2016

• Dimokratias Crossover: Works for the construction of the foundation slab at the northern part have been completed. • SINTRIVANI Crossover: Works for the concreting of provisional openings are in progress. • PANEPISTIMIO Station: Works for the construction of masonry walls at level -1 have commenced. • PAPAFI Station: Works…
Μάθε Περισσότερα

December 2016

• At Papandreou bridge and at Mikras Asias Street, the tramway corridor at the section extending from Papandreou bridge to Gr. Lambraki entrance (after the U-turn) has been completed and tracks are currently installed in the pocket area. • At Grigoriou Lambraki street, the urban planning works at the facing…
Μάθε Περισσότερα

December 2016

• KORYDALLOS Station: Investigation trenches for the Public Utility networks have been completed in Pissidias Shaft. • NIKEA Station: Works for the construction of a section of the station’s roof slab in the area where it is connected to the permanent lining structure of the northern entrance are in progress.…
Μάθε Περισσότερα
WCAG