Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

August 2015

  • Completed are the relocations of OTE networks at the sidewalk of Grigoriou Lambraki street adjacent to the Tramway corridor and the dismantling of ILPAP networks from Ethnikisi Antistasseos Street.
    In progress are the relocations of sewage and EPA networks along with the archaeological works at Vassileos Georgiou street, as well as the relocations of sewage networks at Omiridou Skylitsi street.
    In progress are the relocations of EYDAP (water supply) in the PUO networks diversion trench at the sidewalk of Grigoriou Lambraki street adjacent to the Tramway corridor, where the archaeological excavation works are in progress;
  • In progress are trackworks at Myrtidiotissa and Papandreou bridges, as well as at Mikras Asias street. In progress is also the foundation construction for the Catenary poles at Mikras Asias street;
  • At the completion stage are the works for the urban planning at Gr. Lambraki Street (in the section between Bouboulinas and Georgiou streets) and at Mikras Asias Street (junction with Sarantaporou street). In progress are works for the installation of underground waste bins, along with the consequent urban planning, at 34th Syntagmatos and Agriniou Streets.
Print Friendly, PDF & Email
WCAG