Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

The trackwork in the Metro tunnels comprises the elastic support track, fastened on concrete track-bed (Fixed trackwork).
The tracks have a standard gauge of 1435mm, made by UIC 54 rails, fastened on bi-block sleepers – with microcellular footing and rubber boots – semi-embedded into the trackbed concrete. In addition, the third rail along with its protective cover is fastened on the sleepers, by means insulated brackets. Underneath the trackbed concrete there is a mesh for the collection of stray currents, embedded into the concrete of the tunnel invert. Concrete cable ducts are constructed at both sides of the tunnel; these ducts and their precast covers form the tunnel’s walkway.

The turnouts / crossovers are now installed using the direct fixation system on the concrete slab. Moreover, wherever necessary, measures for noise and vibration mitigation are implemented. In these areas, the turnouts / crossovers and the plain track sections are placed on floating slabs.
In the open-air areas of the Depots, the turnouts / crossovers are installed on wooden or concrete sleepers on ballasted track.

Print Friendly, PDF & Email
WCAG