Thessaloniki Base Project progress

  • Home
  • Thessaloniki Base Project progress
Θεσσαλονίκη Ιούνιος 2022

June 2022

• New Railway Station: Completed are marble cladding works at the central staircase, from the ticketing level to the platform. In progress are marble cladding works at the fixed staircase of the north access, works for the installation of Platform Screen Doors (PSD) as well as works for the installation of guides for aluminum panel […]
Read More
Θεσσαλονίκη Μάιος 2022

May 2022

• New Railway Station: In progress are works for the installation of Platform Screen Doors (PSD) at tracks 1 & 2 and works for the installation of guides for aluminum panel lining at the ticketing level. • DIMOKRATIAS Station: Completed are the works for the installation of PSDs, while reinstatement works at street level on […]
Read More
Θεσσαλονίκη Απρίλιος 2022

April 2022

• New Railway Station: In progress are works for the final surface reinstatement at street level in the area of the south access, marble cladding works at the central staircase from the ticketing level to the platform level, as well as preliminary works for the installation of Platform Screen Doors (PSD) at the side of […]
Read More
Θεσσαλονίκη Μάρτιος 2022

March 2022

• New Railway Station: Completed are works for the installation of guides of the exterior roller shutters at the accesses. In progress are works for the installation of ventilation / air conditioning system equipment. • DIMOKRATIAS Station: Completed are works for the installation of guides of the exterior roller shutters at the accesses. In progress […]
Read More
Θεσσαλονίκη - Φεβρουάριος 2022

February 2022

• New Railway Station: Completed are hole drilling works for the installation of the platform screen doors (PSD) support sub-frames and of the transformers at the Lighting and Auxiliary Power Supply Substation (LAS). In progress are works for the installation of cable trays in the tunnel towards DIMOKRATIAS Station. • DIMOKRATIAS Station: The installation of […]
Read More
Θεσσαλονίκη Ιανουάριος 2022

January 2022

New Railway Station: In progress are hole drilling works for the installation of the platform screen doors support sub-frames. With regard to the traction power supply equipment, the installation of the 20 KV Medium Voltage MVP and SMVP.switchboards in the Lighting and Auxiliary Power Supply Substation (LAS) have been completed, while in progress are works […]
Read More
Θεσσαλονίκη Οκτώβριος 2021

October 2021

New Railway Station: Completed are the works for the pumping station cladding using ceramic tiles, as well as the works for the installation of the monorail. Moreover, the installation of the traction power equipment (technical room 3.9), except for the transformer, has been completed. In progress are vertical marble cladding works at the concourse level, […]
Read More
Θεσσαλονίκη Νοέμβριος 2021

November 2021

New Railway Station: With regard to the traction power equipment, the installation of a rectifier transformer is at a completion stage. In progress are works for the installation of equipment bases at the Lighting and Auxiliary Power Supply Substation (LAS). Completed are works for the installation of the fire-fighting system inside the tunnels at DIMOKRATIAS […]
Read More
Θεσσαλονίκη Δεκέμβριος 2021

December 2021

New Railway Station: In progress are vertical marble cladding works at the accesses. With regard to the traction power supply equipment, the installation of the rectifier transformer has been completed. Completed are also works for the installation of equipment bases of the Lighting and Auxiliary Power Supply Substation (LAS), except for the transformer bases. DIMOKRATIAS […]
Read More
Θεσσαλονίκη Σεπτέμβριος 2021

September 2021

  New Railway Station: Works for the construction of the sewage network and works for the installation of the traction power equipment are in progress. DIMOKRATIAS Station: Surface reinstatement works at the south section and the preliminary works for the installation of the steel frame intended for the mounting of the platform screen doors are […]
Read More