Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

Day: August 2, 2011

July 2011

The first TBM arrived at FLEMING Station. Until the present date, civil works have been completed at a percentage of 37%. The construction of ANALIPSI Station will commence very soon, since the difficult geotechnical problems that have been encountered in the area are finally solved. The reconfiguration of the designs…
Μάθε Περισσότερα
WCAG