Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

Month: September 2014

ATHENS METRO – ATHENS METRO new Line 4 Section “A” ALSOS VEIKOU – GOUDI

The Athens Metro Project, the major transportation infrastructure project, continues to be extended with the construction of the new Line 4, a lifetime Project for many particularly densely populated areas of Attica Basin, with insufficient public transport services. In the framework of the extension of the Athens Metro network, the…
Μάθε Περισσότερα

SIGNATURE OF A LOAN AGREEMENT WITH THE EUROPEAN INVESTMENT BANK (EIB) FOR THE THESSALONIKI METRO EXTENSION TO KALAMARIA

The Chairman and Managing Director of ATTIKO METRO S.A., Mr. Christos Tsitouras, and the Vice-President of the European Investment Bank (EIB), Mr. Mihai Tanasescu, signed today a loan agreement, governed by favourable terms, amounting to EUR 200 million. This amount represents the 1st instalment of the overall credited amount of…
Μάθε Περισσότερα

ATHENS METRO – AGHIA MARINA – DIMOTIKO THEATRO LINE 3 EXTENSION, PIRAEUS Station – Traffic Arrangements

The following traffic arrangements (see attached map) shall be implemented as of Tuesday September 16th, 2014 for the construction of PIRAEUS Station to progress. More specifically: The traffic flow of Akti Kallimassioti street (extension of Akti Possidonos street) towards the centre of Piraeus, is shifted parallel with the sea, while…
Μάθε Περισσότερα

August 2014

NIKEA Station: The works for the construction of a foundation earthing system, soil improvement works and works for the acceptance of the main Station foundation invert have been completed. Excavation works and works for the removal of the muck (removal of the excavated material from the Station NATM tunnel access),…
Μάθε Περισσότερα

August 2014

New Railway Station: The works for the construction of a northern-west and northern-east manhole and the reinstatement of openings at level 1 of the crossover are in progress; AGHIA SOFIA Station: The archaeological excavation at the southern section of the Station is in progress; SINTRIVANI Station: The works for the…
Μάθε Περισσότερα

August 2014

Investigation trenches have been drilled at the locations where twin underground litter bins at Gr. Lambraki Street are to be placed; The works for the construction of Myrtidiotissas bridge have commenced, while the technical works in several locations of the TRAMWAY route are in progress (in the area where KARAISKAKI…
Μάθε Περισσότερα

THESSALONIKI METRO – Concert of Thessaloniki State Symphony Orchestra in THESSALONIKI METRO PANEPISTIMIO Station

On Friday August 29th 2014, ATTIKO METRO S.A. and Thessaloniki State Symphony Orchestra co-organised a concert in Thessaloniki Metro PANEPISTIMIO Station, which was given before a major number of spectators. The Station was inundated with Mozart sounds during a concert that created more than positive impressions, proving that Metro and…
Μάθε Περισσότερα
WCAG