Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

Year: 2016

RFP-300/16 – “PROCUREMENT OF EQUIPMENT FOR THE MODIFICATION OF THE BUILDING AUTOMATION AND CONTROL SYSTEMS IN THE METRO STATIONS ON LINES 2 AND 3 AND THEIR INTERFACE WITH THE AUTOMATIC FARE COLLECTION SYSTEM (AFC) – OASA

Read HERE the Invitation to Tender in .pdf format (674 KB) Read HERE the Conditions of Contract in .pdf format (580 KB) Read HERE the Financial Offer in .pdf format (201 KB) Read HERE the Information Data – Technical Description in .pdf format (2.04 MB) Read HERE the Technical Description –…
Μάθε Περισσότερα

November 2016

NOMARCHIA Station: The construction of the permanent lining from the foundation slab up to level -2 is in progress. NOMARCHIA Crossover: The construction of the permanent lining from the foundation slab up to level -1 was completed. In progress is the construction of the slab of level -1 and the…
Μάθε Περισσότερα

November 2016

NEOS SIDIRODROMIKOS STATHMOS Station: In progress are masonry works at level -1. Dimokratias Crossover: Works for the construction of the northern part foundation micro-piles have been completed, while works for the construction of the foundation slab are in progress at the northern part. DIMOKRATIAS Station: In progress is the archaeological…
Μάθε Περισσότερα

November 2016

• At Ethnarchou Makariou street, tramway construction works (earthworks and trackwork) are in progress from Zaimi area up to Papandreou Bridge. • At Mikras Asias street, urban planning works were completed through the execution of planting works, while the works for the construction of the Tramway at the pocket area…
Μάθε Περισσότερα

November 2016

At the beginning of the extension, in the double track NATM tunnel, Phase A tunnel excavation works from the TBM shaft to Aghia Marina have been completed. Phase B and C tunnel excavation works are in progress. KORYDALLOS Station: Painting works are in progress. NIKEA Station: Painting works are in…
Μάθε Περισσότερα

RFP-301/16 – “PROCUREMENT AND INSTALLATION OF EQUIPMENT FOR THE ADDITION OF DIRECT LINE TELEPHONES (DLT) IN THE METRO STATIONS ON LINES 2 AND 3 INTENDED FOR THE INSTALLATION OF THE AUTOMATIC FARE COLLECTION SYSTEM (AFC) GATES OF OASA”

Read HERE the Invitation to Tender in .pdf format (786 ΚΒ) Read HERE the Financial Offer Form in .pdf format (183 ΚΒ) Read HERE the Conditions of Contract in .pdf format (570 ΚΒ) Read HERE the Technical Description – Specifications in .pdf format (2.67 MΒ)
Μάθε Περισσότερα

RFP-297/16 “PROJECT: PROCUREMENT OF EQUIPMENT FOR THE MODIFICATION OF THE FIRE DETECTION SYSTEMS IN THE METRO STATIONS ON LINES 2 AND 3 AND THEIR INTERFACE WITH THE AUTOMATIC FARE COLLECTION SYSTEM (AFC)-OASA

Read HERE the Invitation to Tender in .pdf format (540 ΚΒ) Read HERE the Conditions of Contract in .pdf format (539 ΚΒ) Read HERE the Financial Offer Form in .pdf format (174 ΚΒ) Read HERE the Technical Data Document in .pdf format (4.19 MΒ) Read HERE the Technical Description –…
Μάθε Περισσότερα

October 2016

At Ethnarhou Makariou street, the relocation of the storm water pipe in the section from Karaoli & Dimitriou street to Myrtidiotissis street has been completed, while in progress are the Tramway earthworks in the same area. At Mikras Asias street, the works for the construction of the Tramway from Papandreou…
Μάθε Περισσότερα
WCAG