• Kritis shaft: The works related to the excavation and temporary retaining of struts down to level -4 have been completed. The excavation and temporary retaining of struts down to level -5 are in progress. • NOMARCHIA Station: The removal of reinforced concrete struts (roof level), as well as the…
Μάθε Περισσότερα

February 2018

[responsivevoice_button voice=”UK English Female” buttontext=”Listen to post”] NEW RAILWAY Station: Implementation of traffic phase E’, as well as plastering and masonry wall related works have been completed. The works for the construction of shaft terminations are in progress. • AGHIA SOFIA Station – north access: The archaeological excavation in progress.…
Μάθε Περισσότερα

February 2018

A. With regard to the TRAMWAY CORRIDOR: In the remaining areas of the entire Tramway network: • Tramway corridor works have been completed: – at N. Faliro stop (installation of turnouts and connection of the Tramway extension to Piraeus with the operating tramway network) – at Mousson Street (installation of…
Μάθε Περισσότερα

February 2018

• AGHIA VARVARA Station – Doors painting works and waterproofing works are in progress. • KORYDALLOS Station – Access 2 excavation works are in progress. Pissidias shaft: Excavation works and works for the installation of the temporary retaining system, foundation improvement and temporary retaining works have been completed. Excavation works…