Day: June 19, 2018

May 2018

Kritis shaft: The excavation and temporary retaining of the pumping station have been completed. • NOMARCHIA Station: Completed are the construction of the permanent lining of the north access, as well as the construction of industrial floors at level -2. The backfilling and construction of PUO networks in the area…
Μάθε Περισσότερα

May 2018

NEW RAILWAY Station: the configuration of the surrounding area is in progress. • DIMOKRATIAS Station: The installation of metal doors at levels -1 and -2 of the station and the backfilling of the south access of the station are completed. The construction of the station’s walls and the implementation of…
Μάθε Περισσότερα

May 2018

A. With regard to the TRAMWAY CORRIDOR: • At Piraeus: – The following activities are in progress, which complete the Tramway Line extension to Piraeus: the construction of the Tramway corridor at Vas. Georgiou street (from the end of Tinaneios (Tinan) garden to Akti Miaouli), at Akti Miaouli pedestrian crossing…
Μάθε Περισσότερα

May 2018

• Komninou Shaft: The works for the permanent lining of the shaft walls have been completed and the construction of a staircase is in progress. • AGHIA VARVARA Station: The works for the placement of ventilation trays and brackets are in progress. • M. Alexandrou shaft: The construction of the…
Μάθε Περισσότερα