Day: March 15, 2019

FEBRUARY 2019

Piraeus TBM access shaft: The construction of slabs at levels +47.46 and +56.11 has been completed, while the surface reinstatement is in progress. Komninou shaft: The installation of a grid at street level has been completed, while the architectural works (manufacturing of balustrades) are in progress. AGHIA VARVARA station: The…
Μάθε Περισσότερα

FEBRUARY 2019

As regards the TRAMWAY NETWORK The works for the construction of the Tramway corridor have been completed (trackwork – rails – catenary) have been completed. The trial run of the Tramway system commenced, while checking – arrangements – tests of the Tramway and catenary related installations are at the completion…