Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

Month: April 2019

MARCH 2019

Α. Tramway The works for the construction of the tramway corridor (trackwork – rails – catenary) have been completed. The trial run of the Tramway system has commenced. Setting – checking of the systems controlling the operation of the Tramway system extension to Piraeus from the Central Control Room in…
Μάθε Περισσότερα

MARCH 2019

– TBM access shaft: The installation of an indoor steel plate has been completed. – Komninou shaft: Surface reinstatement is in progress. – Megalou Alexandrou shaft: Surface reinstatement is in progress. – Pissidias shaft: The final lining of Pissidias Shaft has been completed, screed placing at the treads of the…
Μάθε Περισσότερα
WCAG