Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

APRIL 2019

Α. Tramway

  • The works for the construction of the tramway corridor (trackwork – rails – catenary) have been completed.
  • The following works are in progress:
  • The trial run of the Tramway system and the adjustment – checking of the systems and devices controlling the operation of the Tramway system (for integration of the extension to Piraeus with the basic network).
  • Road signage and signaling works on junctions along the Tramway route.
  • The following works are pending:
  • E/M works at the new Substation 16 (Civil Works have been completed), as well as the upgrading of Substation

Β.   OTHER WORKS (reference to extended work fronts)

  • Lambraki Bridge: Concrete maintenance works are in progress.
  • Platform located in Posidonos Avenue: the special flooring (dispaly of the underlying antiquities)
  • Along the Tramway route in Piraeus, the following works are in progress:
    • the works related to the installation of urban equipment are about to be completed at the stops, as well as the installation-testing of E/M equipment.
    • The installation of lifts in the area of Lambraki Bridge and in the area of Karaiskaki stop.
Print Friendly, PDF & Email
WCAG