AUGUST 2019

KORYDALLOS STATION

The following works are in progress:

  • Door installation
  • Ceramic tiles installation
  • Granite or marble installation

MANIATIKA STATION

UNDERGROUND NATM SECTIONS OF THE STATION (ΝΑΤΜ)

The following works have been completed:

  • Permanent lining of the lower transverse tunnel and of the west elevator

DIMOTIKO THEATRO STATION

UNDERGROUND SECTION OF THE STATION

The following works have been completed:

  • Permanent lining concreting works
  • Concreting works for masonry walls and the platform slab

ENTRAMCE TO KORAI SQUARE

The following works have been completed:

  • Concreting works for the permanent lining of the floor, the perimeter walls and the ceiling (the area of the elevator is pending)

PANEPISTIMIO SHAFT

The following works have been completed:

  • Archaeological excavation and deconstruction
  • Excavation – temporary retaining of shaft and pumping station