Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

September 2021

Καλαμαριά Σεπτέμβριος 2021

 

The equipment of the Platform Screen Doors has been delivered in all stations.
• Kritis Shaft: Preliminary works for the industrial flooring are in progress.
• NOMARCHIA Station (Station and Crossover): Works for the construction of granite water discharge grooves at the central staircase are in progress. At the crossover works for the backfilling of the ceiling slab in the area of the opening are in progress, along with preliminary reinstatement works at street-level and masonry works.
• KALAMARIA Station: Works for the implementation of the 10th traffic arrangement have been completed, while works at the fire fighting system are in progress.
• ARETSOU Shaft: Works for the installation of equipment for the traction power supply system are in progress.
• MICRA Station: Works for the installation of ceramic tiles, works for the installation of stainless steel balustrades and works for the installation of electrical trays are in progress.
TRACKWORK
In progress are works for the installation of the ventilation system and for the installation of electrical trays at the 1st interstation/ track 2, works for the installation of electrical trays and cabling for the lighting system at the 2nd interstation/ track 2, works for the installation of electrical trays at the 3rd interstation/ track 1 and works for the installation of fire fighting hose cabinets at the 4th interstation/ tracks 1 & 2. In progress are also works for the installation of the 3rd rail at the tunnel section extending from ARETSOU Station up to the Forestation/ tracks 1 and 2.

Print Friendly, PDF & Email
WCAG