Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

DECEMBER 2021

Πειραιάς Δεκέμβριος 2021

TZAVELA Shaft

 The following works have been completed:

  • Permanent lining of the shaft and of the connecting tunnel.
  • Construction of sound absorbing plaster.
  • Installation of staircase balustrades.
  • Reinstatement of Tzavela and Lakonias Streets, opening to the

The following works are in progress:

  • Architectural finishes – staircase painting works (walls, floors).

MANIATIKA STATION

STATION’s OPEN CUT      

The following works have been completed:

  • Permanent lining of the shaft.
  • Construction of partition walls at the station’s expropriation limits (street level).
  • Surface reinstatement (construction of sidewalk) at Mavromichali street.

The following works are in progress:

  • Architectural finishes – Painting works at levels -4, -3, -2, -1.
  • Installation of metal structures in room 3.12.
  • Installation of steel supports of false ceilings and steel cladding (panels) on the walls of the main areas at the station’s level -1.
  • Surface reinstatement (construction of sidewalk) in Etolikou street.

MAIN TUNNEL OF THE STATION (ΝΑΤΜ)

 The following works have been completed:

  • Steel cladding on the roof and side coverings.

UNDERGROUND NATM SECTIONS OF THE STATION (NATM)

The following works have been completed:

  • Installation of granites at the platforms.

The following works are in progress:

  • Installation of granites at the staircases.
  • Installation of lining at the access tunnels of the station and at the upper transverse access gallery.

SOUTH VENTILATION SHAFT OF THE STATION (Koumoundourou Street)

The following works have been completed:

  • Permanent lining of the shaft and of the connecting tunnel.
  • Construction of perimeter wall at the boundaries of the expropriation.
  • Construction of metal structures at K.P. +8.36 and +21.00.
  • Application of sound absorbing plaster.
  • Installation of staircase balustrades.
  • Architectural finishes (painting works).

The following works are in progress:

  • Surface reinstatement (construction of sidewalk and of surrounding area).
  • Painting of parapet walls at street level.

NORTH VENTILATION SHAFT OF THE STATION (Dimitrakopoulou Street)

The following works have been completed:

  • Permanent lining of the shaft and of the connecting tunnel.
  • Pile cap beam demolition.
  • Installation of metal structures at K.P. +8.08 and +24.98.
  • Construction of sound absorbing plaster.
  • Architectural finishes (painting works).
  • Installation of staircase balustrades.

The following works are in progress:

  • Painting of parapet walls at street level.

MELA SHAFT

The following works have been completed:

  • Concreting of intermediate slabs (landings).
  • Concreting of interior wall.

The following works are in progress:

  • Dismantling works at the shaft’s perimeter and construction of the shaft’s exterior stair.

PIRAEUS STATION

The following works have been completed:

  • Concreting of main station (works at a small section of the roof slab and at the stairs towards the street level are pending).

The following works are in progress:

  • Excavation and temporary retaining of entrance 3.
  • Shotcrete at entrance 3 (lift shaft).
  • Concreting of intermediate entrance slabs.
  • Construction of architectural finishes (installation of metal doors at level -1, wall cladding at the level underneath the platform and at platform level, installation of false ceilings at level -3, installation of galvanised steel panels at level -3).
  • Installation of mechanical equipment at levels -1, -2 and at the level underneath the platforms.
  • High pressure water blasting at the diaphragm walls between the station and accesses 2 & 3.
  • Waterproofing of accesses 1, 2 & 3.
  • Concreting of foundation slab at accesses 2 & 3.
  • Concreting of exterior and interior perimeter partition walls at accesses 1, 2 & 3.

ROLOI SHAFT & NATM ACCESS TUNNEL

 The following works have been completed:

  • Sealing of the temporary pumping station.

 The following works are in progress:

  • Installation of emergency exit hatch at street level.

DIMOTIKO THEATRO STATION

MAIN STATION – AGHIOU KONSTANTINOU SQUARE

The following works have been completed:                                                                                 

  • Sealing of the temporary pumping station.
  • Traffic reinstatement at V. Georgiou Street.
  • Traffic reinstatement at Karaiskou Street.

The following works are in progress:

  • Reinstatement at street level (paving works at Karaiskou Street and construction of inner parapet walls at the square).
  • Construction of false ceiling at the concourse and at the platform levels.
  • Installation of wall panels at the concourse and at the platform levels.
  • Construction of wall-mounted granites at the platform level.
  • Construction of wall-mounted granites at staircase 1 (main station entrance).
  • Installation of floor granite at the platform level.
  • Installation and painting of doors at level -1, at the concourse level and at the platform level.
  • Conservation of the Project’s archaeological finds.

UNDERGROUND SECTION OF THE STATION

The following works have been completed:

  • Concreting of the permanent lining.

  The following works are in progress:

  • Installation of steel panels at the platform level.

STAIRCASE GALLERIES

The following works have been completed:

  • Concreting of the permanent lining and secondary concrete.

KORAI SQUARE ENTRANCE AND ACCESS GALLERY

The following works have been completed:

  • Concreting of the permanent lining, secondary concrete.

The following works are in progress:

  • Installation of wall granites at the staircase.

BAKOYIANNI SQUARE ENTRANCE AND ACCESS GALLERY

The following works have been completed:

  • Concreting of permanent lining.     

The following works are in progress:

  • Transfer of the antiquities in the floor recess displaying the pebbled floor.

DIMOTIKO THEATRO VENTILATION SHAFT (RALLIOS SHAFT) AND VENTILATION GALLERY       

The following works have been completed:

  • Sealing of the temporary pumping station.
  • Sidewalk reinstatement on V. Georgiou Street.

The following works are in progress:

  • Installation of doors.

TRIPLE TRACK NATM TUNNEL

The following works have been completed:

  • Construction of permanent lining.

DELIGIANNI SHAFT

The following works have been completed:

  • Excavation and temporary retaining.
  • Concreting of the permanent lining.

The following works are in progress:

  • Backfilling – condensation.
  • Dismantling of pile cap beam demolition.

PANEPISTIMIO SHAFT & VENTILATION TUNNEL

The following works have been completed:

  • Concreting of the permanent lining of the connecting tunnel.
  • Construction of the shaft’s permanent lining.

The following works are in progress:

  • Construction of the permanent lining of the shaft (completed).
Print Friendly, PDF & Email
WCAG