Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

October 2022

Καλαμαριά Οκτώβριος 2022
  • KALAMARIA Station: In progress are works for the installation of stainless steel balustrades.
  • ARETSOU Station: In progress are works for the installation of the Platform Screen Door (PSD) system.
  • NEA KRINI Station: In progress are works for the installation of storm and waste water pumps, collectors and discharge networks.
  • MIKRA Station: In progress are works for the installation of networks and equipment for the ventilation / air conditioning system.

TRACKWORK:

In progress are works for the installation of the fire fighting network at interstation 1 / track 2, as well as works for the installation of electrical trays at interstations 3 and 4 / track 2.

Print Friendly, PDF & Email
WCAG