Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

December 2022

Καλαμαριά Δεκέμβριος 2022
  • NOMARCHIA Station: In progress are asphalt paving works, as well as the escalators’ setting works and SAT tests.
  • KALAMARIA Station: In progress are works for the installation of stainless steel balustrades and granites at the staircases.
  • ARETSOU Station: In progress are fire detection related works.
  • NEA KRINI Station: In progress are works for the installation of stainless steel balustrades, fire detection works, works for the installation of trays and earthing at track level, as well as works for the installation of equipment and air ducts for the HVAC system.
  • MIKRA Station (Station and Crossovers): In progress are street surface reinstatement works, as well as works for the installation of stainless steel balustrades and stainless steel rings on the circular propping items.
  • Terminal Shaft: In progress are works for the installation of sewage, fire fighting and water supply networks (connections with tunnel networks).

TRACKWORK:

In progress are works for the installation of electrical trays, trays earthing and air vents on the fire fighting network at interstations 2, 3, 4 and 5/ tracks1 and 2.

Print Friendly, PDF & Email
WCAG