Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
  • The works related to the construction of shafts and accesses of PANEPISTIMIO Station have been completed down to level -3;
  • The works related to the construction of the level -2 slab have commenced in ANALIPSI Station;
  • The works for the boring of the two tunnels from the New Railway Station to ANALIPSI Station have been completed. Preparations for the transfer of the Tunnel Boring Machines to NEA ELVETIA Station are ongoing;
  • The works related to the construction of roof micro-tunnels at level -2 underneath the Basilica Church in SINTRIVANI Station have been completed.
Print Friendly, PDF & Email
WCAG