Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

March 2015

  • For the needs of the Project, temporary traffic arrangements were implemented in Mikras Asias, Grigoriou Lambraki and Omiridou Skylitsi streets;
  • The necessary works for the relocation of EYDAP water supply, PPC and EPA networks at the sidewalk of Gr. Lambraki Street opposite to the tramway corridor were completed, while the relocation of EYDAP sewage networks at the sidewalk of Gr. Lambraki Street adjacent to the tramway corridor and at Omiridou Skylitsi street (Ippodamias Square – 34ou Syntagmatos street) have commenced;
  • The works on the sidewalk of Gr. Lambraki Street opposite the tramway corridor and at two junctions at Akti Themistokleous (i.e. Sklavounou and Kazanova Streets, entrance to Zeas Marina) were completed, while at an advanced stage are the reconfiguration works at Alikakou Square, on the sidewalk of Ethn. Antistaseos Street opposite the tramway corridor, at Gr. Lambraki Street reversing point (tramway corridor), on the sidewalks of Lambraki Bridge etc.;
  • Technical works are in progress in the area where KARAISKAKI stop is foreseen to be located, at Lambraki Bridge, etc..
Print Friendly, PDF & Email
WCAG