Web Portal - Elliniko Metro A.E.
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa
ELLINIKO METRO A.EELLINIKO METRO A.EELLINIKO METRO A.E logo espa

October 2014

  • The investigation trenches in order to identify PUO networks and investigate locations where underground litter bins are to be constructed (Gr. Lambraki, Georgiou, Ethnikis Antistaseos, Omiridou Skylitsi etc. streets) are in progress;
  • The works for the relocation of street lighting poles at Mikras Asias street (after the necessary reconfiguration of the traffic island between the road surface and ISAP trolley lines) have commenced, while the works for the relocation of ILPAP trolleybus line No. 20 from Vas. Georgiou street to Bouboulinas street are at the final stage;
  • The works for the construction of a new Tramway bridge at Myrtidiotissa were completed, while technical works (in the area of the foreseen Karaiskaki stop, in the Peace & Friendship Stadium (SEF) area, at Lambraki bridge etc.) are in progress;
  • The urban planning works (configurations of sidewalks, planting areas etc.) are in progress. In particular, the works for the configuration of the sidewalk (between Karaoli Dimitriou and Tsamadou streets) have commenced at the sidewalk of Gr. Lambraki street opposite of the Tramway path, at Iroon Polytechniou street. Moreover, works have commenced at the sidewalk of Mikras Asias street opposite of the Tramway path, at the U-turn of Lambraki street (i.e. at the traffic island between Mikras Asias – Pireos streets and the Tramway corridor, where planting works are at a final stage).
Print Friendly, PDF & Email
WCAG