PROGRESS OF WORKS

JUNE 2019

Α.            Tramway

  • Further to the completion of the works for the construction of the tramway (see previous progress of works), the following works are in progress.
  • The final tests – adjustments of the systems and devices controlling the operation of the Tramway system (for integration of the extension to Piraeus into the basic network) and the adjustment – coordination of the circulation of the tramway vehicles with the road signage.
  • Road and railway signage works along the Tramway route.
  • The E/M works at the new Substation 16 (Civil Works have been completed), as well as the upgrading of Substation 1 are pending.

Β.            OTHER WORKS (reference to extended work fronts)

  • Lambraki Bridge: Concrete curing works and staircases urban planning works are in progress.
  • Platform located in Posidonos Avenue: further to the completion of the special lining of the floor (display of the underlying antiquities), the works for the installation of the urban equipment (seats, etc.) will soon be completed.
  • Stops: the works for the installation of the urban equipment have been completed, while the works for the installation of E/M equipment will soon be completed and final testing is in progress.
  • The installation of the foreseen lifts in the area of Lambraki Bridge and in the area of Karaiskaki stop is about to be completed.
  • The final tests of the remaining installed underground waste bins before their delivery for use are in progress.
Print Friendly, PDF & Email

ΜΑΥ 2019

Α. Tramway

  • The works for the construction of the tramway corridor (trackwork – rails – catenary) have been completed.
  • The following works are in progress:
  • The trial run of the Tramway system and the adjustment – checking of the systems and devices controlling the operation of the Tramway system (for integration of the extension to Piraeus into the basic network) and the adjustment – checking of the circulation of the tramway vehicles with the road signage.
  • Road signage and signaling works on junctions along the Tramway route.
  • The following works are pending:
  • E/M works at the new Substation 16 (Civil Works have been completed), as well as the upgrading of Substation

Β.   OTHER WORKS (reference to extended work fronts)

  • Lambraki Bridge: Concrete maintenance works are in progress, while urban staircases planning works have commenced and are in progress.
  • Platform located in Posidonos Avenue: the special flooring (display of the underlying antiquities) are in progress.
  • Along the Tramway route in Piraeus, the following works are in progress:
    • The works related to the installation of urban equipment have been completed at the stops, while the works for the installation-testing of E/M equipment are in progress.
    • The installation of the foreseen lifts in the area of Lambraki Bridge is about to be completed and in progress is in the area of Karaiskaki stop.
    • The final tests of the remaining installed underground waste bins before their delivery for use are in progress.