Extension to Kalamaria

Extension to Kalamaria

Thessaloniki Metro line is currently being extended towards the areas of Nomarchia, Kalamaria, Aretsou, Nea Krini and Micra. This underground extension shall be 4.78km long with 5 new Stations. More precisely, the project concerning the first extension of Thessaloniki Metro to Kalamaria was tendered on May 6th, 2009 and the relevant contract was concluded on June 2013 with AKTOR ATE Joint Venture. The total budget of the project amounted to 518 million (400 million € concern the contract in question). This project has been integrated in the National Strategic Framework – “Macedonia – Thrace” Business Plan and is funded by the European Investment Bank. In June 2014, construction works have commenced at NEA KRINI Station, which is included in the Thessaloniki Metro extension to Kalamaria, and constitutes the second Metro worksite after the TBM startup shaft.

Moreover, the infrastructure for the future extension of the Metro Line to the Airport is foreseen to be constructed together with a well-organized Bus Transfer Station in the area of Micra Station. A car parking facility is also planned to be constructed in the same Station.

This extension shall service more than 65,000 passengers, proportionally reducing the number of trips by private vehicles. It shall only take 15 minutes to cover the distance from Micra Station to the center of Thessaloniki. This project shall upgrade the municipality of Kalamaria in terms of transportation and environment, improving at the same time citizens’ every-day life.

Print Friendly, PDF & Email

PROGRESS OF WORKS

February 2020

NOMARCHIA Station (station & crossover): In progress are the works for the installation of granites at the platform level, as well as the works related to sewage, earthing of electric trays and piping of the lighting network, power distribution and low voltage (weak currents) networks.

KALAMARIA Station: In progress are piping works of the lighting network, power distribution and low voltage networks.

ARETSOU Station: Tunnel ventilation equipment related works are in progress.

NEA KRINI Station: In progress are the works for the reinstatement at street level, the relocation of PUO networks, the installation of earthing of electric trays, works for the installation of piping for the lighting network and works for the installation of lighting fixtures in technical rooms.

MIKRA Station (Station & Crossovers): In progress are surface reinstatement works, works for the installation of fibre-cement boards and works for supporting water supply, sewage and fire fighting networks.

TBM tunnels: The works for the construction of trackwork at a tunnel section are in progress.

Print Friendly, PDF & Email

January 2020

Kritis Shaft: The works for the construction of the permanent lining are in progress.

NOMARCHIA Station (station & crossover): The works for the installation of galvanized balustrades and handrails are in progress. Moreover, in progress are the works for the installation of ventilation equipment, fire-rated air ducts, fire fighting networks and electric trays.

KALAMARIA Station: In progress are backfilling works, works for the reinstatement of the surrounding area, for the relocation of PUO networks, as well as works for the installation of electric trays and fire fighting networks.

ARETSOU Station: In progress are reinstatement works at street level, works for the installation of galvanized balustrades and handrails, for cladding with fiber-cement boards, as well as works for the installation of electric trays.

MIKRA Station (Station & Crossovers): In progress are backfilling works, works for the installation of fibre-cement boards and works for the installation of tunnel ventilation systems.

TBM tunnels: The works for the construction of trackwork at a tunnel section are in progress.